2009 FMS Summer Institute
July 27 - August 7, 2009
"Queer Politics in Transnational Contexts"
Applying to the Summer Institute
Twelve to fourteen scholars will be selected to participate in the summer institute.
A subsidy will be available to cover room, board, and (if needed)
travel costs.
Application deadline: January 15, 2009; results announced by March 9, 2009.
Download Application Instructions (pdf)
Download Application Form (pdf)
The application form and instructions are available here is in Adobe Acrobat's portable
document format (PDF). If you do not have Adobe Acrobat, you will
need to obtain and install a copy of the Acrobat
Reader before you can view or print the PDF file.
|